Project completed

  • Reconstruction of offices and warehouses for Pepsi-Cola Company 1997-1998. Pepsi-cola co. Almaty.
  • Reconstruction of central branch of KZI Bank 1997-1998. Kazakhstan, Almaty.
  • Installation of 15 minute force entry walls, and hardline doors (security) for USAID office. 1998-1999. USAID. Tashkent.
  • Reconstruction of office building, and apartments for Balfor Bitty company. 1998-1999, Balkhash, Balfor Beatty Mensel.
  • Reconstruction of clinker storage at Shymkent cement factory. 1998-1999. Italcementi group. Shymkent.
  • Reconstruction of “Demir Kazakhstan Bank”. 1998-1999. Atyrau.
  • Reconstruction of offices for Borusan Makina Company. 1998-1999. Borusan Makina Company. Almaty.
  • Reconstruction of “Demir Kazakhstan Bank”. 2000-2001. Almaty.
  • Installation of 15 minute force entry walls, and hardline doors (security) for USAID office. 2000-2001. USAID. Ashgabat.
  • Reconstruction of substation for K-Mobile Company. 2000-2001. Almaty.
  • Construction of dry construction mix production Plant YKS Company. (now existing BASF Plant) 2000-2001 Kazakhstan, Almaty.
  • Civil works of coal mill project for “Shymkentcement” factory. 2001-2003. Italcementi group. Shymkent.
  • Remodeling and decoration of Michel Wilson offices law Company. Nurly Tau Business Centre.  2005-2007. Almaty.
  • Construction of “Anakon” warehouse, office building 2006-2008 Almaty, Koksay.
  • Reconstruction Central branch and small branch of Bank Pozitiv Kazakhstan 2008-2009 Almaty.


“Nurly Tau” center


       The construction work of office premises of the «Michael Wilson and Partners» company have been done in the polyfunctional business center “Nurly Tau”, on the seventh floor, square area was about 1000m. The indoor was at the stage rough finished (wall fencing, concrete floor).

 The following works were performed by our company:

  • Wall cladding from natural wood, decorative glass partitions, rooms with a special cement screed, internal partitions of gypsumboard with acoustic insulation, stained glass windows of wood veneer and termopans.
  • Inside the floors were made 2 separate mezzanine levels with a spiral ladders. Finishing the entire premises was decorated under a tree (boiserie). Provided conditioning – ventilation devise with cold transparency from the complex (Oil Funk). Manufacture of kitchen and other furniture is also included in our services.
  • It was reconstructed heating system, landscaping and decoration of balconies with floor heating. Fully implemented the design and installation of fan systems, IT communications, electricity, fire alarm systems, installation and design of access and security and other special works to ensure the effective operation of the office premises.
  • Shield construction of walls and ceilings during the construction of the buildings were made of metal with insulating glass filling. These structures in the process, during reconstruction were armored with proof skin, which also serves the function (sun filler).   

      We used materials from Denmark, Turkey, Italy, Russia, as methods of manufacture and installation of special fire doors, installation of opening/closing type of «Antipanic».

As a result of the mentioned above works the building was put into operation «turkey».


Positive Bank Kazakhstan


          “Bank Positive Kazakhstan” JSC provided the amount of work to reconstruct existing facilities, the total area of 1300 sq. m. Full dismantling of structural barriers, engineering networks, systems, air conditioning, ventilation, security systems, alarm systems, and IT communications was made previously. Works were produced in accordance with the requirements of the arrangement of  2-nd Level National Bank of Kazakhstan.

  • Works under construction of preciousness and depository storage, cash systems, guestrooms for the directories, management, reception areas, the operating room, as well as office space for professionals servicing of security systems, video surveillance, access, IT communications.
  • Finishing work on laying tile floor, suspended ceilings installed, decoration of walls and partitions, ATMs mounting and installation, advertising systems, lighting panels, etc.
  • Soft and cabinet furniture in all rooms of branches of the bank is made completely.
  • Special works were fulfilled to have access loading and unloading cash messenger vehicles with the entire system of video surveillance inside and outside perimeter of the bank with the installing of barriers, passes cars (automatic barrier with warning lights).
  • Ventilation and air conditioning in all rooms were designed and installed.
  • During construction of the building were used special materials from Turkey, Kazakhstan, Germany, and Poland.